In the era of the climate emergency and different pandemics, systems that can provide an immediate response to housing needs are required. This paper aims to evaluate the use of fibre-reinforced plastic polymers (FRPs) to satisfy this need. In particular, a modular emergency housing system that utilises FRPs for structures and cladding is proposed, which proves adaptable to both different uses and different kinds of temporary or permanent buildings. By adapting modular emergency housing to different contexts, developing an integrated design process (IDP) and building information modelling (BIM) methodology, this research aims to provide innovations for the the architecture, engineering, and construction (AEC) sector, including FRPs, through a digitised approach, applied also to an experimental case study. A pilot unit of the modular emergency housing system, a nearly zero-energy building (nZEB), is described in detail, while laboratory tests are reported. Construction considerations confirm the sustainability and highlight the adaptability of the modular system to different housing needs conditions, justifying the possible future development of supply chain industrialisation supported by the presented methodology.

Modular Housing Using Fibre-Reinforced Plastic Polymers (FRPs)

Iannace G.
2024

Abstract

In the era of the climate emergency and different pandemics, systems that can provide an immediate response to housing needs are required. This paper aims to evaluate the use of fibre-reinforced plastic polymers (FRPs) to satisfy this need. In particular, a modular emergency housing system that utilises FRPs for structures and cladding is proposed, which proves adaptable to both different uses and different kinds of temporary or permanent buildings. By adapting modular emergency housing to different contexts, developing an integrated design process (IDP) and building information modelling (BIM) methodology, this research aims to provide innovations for the the architecture, engineering, and construction (AEC) sector, including FRPs, through a digitised approach, applied also to an experimental case study. A pilot unit of the modular emergency housing system, a nearly zero-energy building (nZEB), is described in detail, while laboratory tests are reported. Construction considerations confirm the sustainability and highlight the adaptability of the modular system to different housing needs conditions, justifying the possible future development of supply chain industrialisation supported by the presented methodology.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11591/545472
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact