Heating and current drive systems such as high energy Neutral Beam Injection (NBI) are being considered for pulsed EU DEMO (“DEMO1”) pre-conceptual design. Their aim is to provide auxiliary power, not only during flat-top, but also during transient phases (i.e. plasma current ramp-up and ramp-down). In this work, NBI fast particle power loads on DEMO1 first wall, due to shine-through and orbit losses, are calculated for the diverted plasma ramp-up phase. Numerical simulations are performed using BBNBI and ASCOT Monte Carlo codes. The simulations have been done using a complete 3D wall geometry, and implementing the latest DEMO NBI design, which foresees NBI at 800 keV particle energy. Location and power density of NBI-related power loads at different ramp-up time steps are evaluated and compared with the maximum tolerable heat flux taken from ITER case. Since NBI shine-through losses (dominant during low density phases) depend mainly on the beam energy, plasma density and volume, DEMO has a more favourable situation than ITER, enlarging NBI operational window. Using ITER criteria, DEMO NBI at full energy and power could be switched on during ramp-up at ~ 1.3 × 1019 m-3. This increases the appeal of neutral beam injectors as auxiliary power systems for DEMO.

Estimate of 3D power wall loads due to Neutral Beam Injection in EU DEMO ramp-up phase

Mattei M.;
2019

Abstract

Heating and current drive systems such as high energy Neutral Beam Injection (NBI) are being considered for pulsed EU DEMO (“DEMO1”) pre-conceptual design. Their aim is to provide auxiliary power, not only during flat-top, but also during transient phases (i.e. plasma current ramp-up and ramp-down). In this work, NBI fast particle power loads on DEMO1 first wall, due to shine-through and orbit losses, are calculated for the diverted plasma ramp-up phase. Numerical simulations are performed using BBNBI and ASCOT Monte Carlo codes. The simulations have been done using a complete 3D wall geometry, and implementing the latest DEMO NBI design, which foresees NBI at 800 keV particle energy. Location and power density of NBI-related power loads at different ramp-up time steps are evaluated and compared with the maximum tolerable heat flux taken from ITER case. Since NBI shine-through losses (dominant during low density phases) depend mainly on the beam energy, plasma density and volume, DEMO has a more favourable situation than ITER, enlarging NBI operational window. Using ITER criteria, DEMO NBI at full energy and power could be switched on during ramp-up at ~ 1.3 × 1019 m-3. This increases the appeal of neutral beam injectors as auxiliary power systems for DEMO.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11591/415477
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? 3
social impact