The scheduling optimization for no-wait production systems is still a significant theme in production management research, applied both to job-shops and flow-shops organizations. In this paper we present a general procedure used to determine the number of parallel stations to be introduced in a production line given specific work cycles with no wait constraint and given production levels to be achieved.

A model for the design of production lines with no wait constraints and sub-cycles

Fera M.;Macchiaroli R.;
2013

Abstract

The scheduling optimization for no-wait production systems is still a significant theme in production management research, applied both to job-shops and flow-shops organizations. In this paper we present a general procedure used to determine the number of parallel stations to be introduced in a production line given specific work cycles with no wait constraint and given production levels to be achieved.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11591/437201
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
social impact