FERA, Marcello

FERA, Marcello  

Dipartimento di Ingegneria  

Mostra records
Risultati 1 - 20 di 86 (tempo di esecuzione: 0.035 secondi).
Titolo Data di pubblicazione Autore(i) File
A comparison between the sprinklers nozzles dimensioning imposed by the European and the American fire safety norms – Case Study: A warehouse containing plastic 1-gen-2013 Fera, M; Iannone, R; Lambiase, A; Macchiaroli, Roberto; Miranda, S.
A cost estimation approach for aircraft design enhancement 1-gen-2024 Abbate, R.; Turino, M. A.; Morse, L.; Fera, M.; Mallardo, V.; Macchiaroli, R.
A maintenance policy selection method enhanced by industry 4.0 technologies 1-gen-2019 Caterino, M.; Fera, M.; Macchiaroli, R.; Manco, P.
A model for the design of production lines with no wait constraints and sub-cycles 1-gen-2013 Fera, M.; Iannone, R.; Lambiase, A.; Macchiaroli, R.; Miranda, S.; Riemma, S.
A Modified genetic Algorithm for Time and Cost Optimization of an Additive Manufacturing Single-Machine Scheduling 1-gen-2018 Fera, Marcello; Fruggiero, F; Lambiase, A; Todisco, V; Macchiaroli, R
A modified tabu search algorithm for the single-machine scheduling problem using additive manufacturing technology 1-gen-2020 Fera, M.; Macchiaroli, R.; Fruggiero, F.; Lambiase, A.
A multi-item constrained EOQ calculation algorithm with exit condition: A comparative analysis 1-gen-2015 Miranda, S.; Fera, M.; Iannone, R.; Riemma, S.
A new mixed production cost allocation model for additive manufacturing (MiProCAMAM) 1-gen-2017 Fera, M.; Fruggiero, F.; Costabile, G.; Lambiase, A.; Pham, D. T.
A new perspective for production process analysis using additive manufacturing—complexity vs production volume 1-gen-2018 Fera, M; Macchiaroli, R; Fruggiero, F; Lambiase, A
A new procedure for spare parts inventory management in ETO production: a case study 1-gen-2023 Rinaldi, M.; Fera, M.; Macchiaroli, R.; Bottani, E.
A proposal for a new management framework for health care organizations simulation and optimization 1-gen-2010 Fera, M; Macchiaroli, Roberto
Additive manufacturing in green supply chains: A parametric model for life cycle assessment and cost 1-gen-2023 Manco, P.; Caterino, M.; Rinaldi, M.; Fera, M.
Addressing the maintenance strategy selection issue in the industrial field: A literature review 1-gen-2023 Abbate, R.; Turino, M. A.; Caterino, M.; Fera, M.; Macchiaroli, R.
Aircraft Maintenance: Structural Health Monitoring Influence on Costs and Practices 1-gen-2021 Manco, P.; Caterino, M.; Macchiaroli, R.; Rinaldi, M.; Fera, M.
An Obsolescence Management Model for the Contract Logistic Support Enterprises 1-gen-2007 Fera, M; Macchiaroli, Roberto; Nenni, M. E.
Analisi del Rischio Incendio all’interno di una Galleria Stradale per l’Individuazione dell’Influenza delle Caratteristiche Geometriche sull’Efficienza di un Impianto di Spegnimento Automatico 1-gen-2007 Apolloni, S; Fera, M; Macchiaroli, Roberto
Application of a business process model (BPM) method for a warehouse RFID system implementation 1-gen-2017 Fera, Marcello; Macchiaroli, Roberto; Fruggiero, Fabio; Lambiase, Alfredo; Miranda, Salvatore
Appraisal of a New Risk Assessment Model for SME 1-gen-2010 Fera, M.; Macchiaroli, Roberto
Appraisal of a New Safety Assessment Method using the Petri Nets for the Machines Safety 1-gen-2018 Caterino, M.; Fera, M.; Macchiaroli, R.; Lambiase, A.
Cloud remanufacturing: Remanufacturing enhanced through cloud technologies 1-gen-2022 Caterino, M.; Fera, M.; Macchiaroli, R.; Pham, D. T.